The line with the longest development and the shortest tolerance. A heel is the one style where a pattern that is a few millimetres out is invisible on the table and obvious the moment the pair is stood up, so almost all the work happens before bulk starts.

02 / How it's built

How a heeled pair
is actually built.

Five stages run on this floor. On this line two of them carry the style — the bench where the last and the heel are settled, and the one where balance is proved on a real pair.

  1. Design and sampling

    The last and the heel are settled together and neither can be swapped afterwards. An existing last is production; a new last is development work first.

  2. Cutting

    Pattern pieces on a heeled style are small and the tolerances are tight, because everything on the shoe is read against the line of the last.

  3. Closing and lasting

    The upper is stitched, pulled over the last and the heel attached. Fit and balance are proved on a physical pair — there is no other way to settle them.

  4. Finishing and inspection

    Edges, covering and packing. Pairs are matched side by side and checked against the approved sample before they are boxed.

Two workers at the cementing bench, one holding a pale blue heeled upper, sole units and lasts on the table between them.
Cementing bench, heel line · Bình Dương
03 / Quoting

What to send
for a heeled quotation.

Four things move the price on this line, and the first of them moves the schedule more than the volume does.

  1. Last, or a reference pair

    An existing last is production. A new last is development work first, and it sets the schedule.

  2. Heel height and shape

    Together with the last it fixes pitch and balance, which is what the wearer actually judges.

  3. Construction

    Agreed per style at sampling. Send it early and we will say whether the equipment is here.

  4. Size run and ratio

    Grading on a heeled last is more work than on a flat one; it belongs in the first conversation.

Send the materials and finish too if you have them — height and finish are agreed together, because a finish that works at one height can look wrong at another. Terms are FOB, ex Bình Dương, or built to your nominated suppliers; minimums, sampling and bulk timing are quoted per programme.

Audited against
  • Global Recycled Standard Certification
  • amfori BSCI Audit programme
  • SMETA 4-Pillar Audit methodology
  • SCAN Audit programme
04 / Quote

Send the last, or the pair.

Whichever you have. On this line the physical object is worth three pages of specification.